Tree crews across Garden Home
The old orchard and nursery stock that gave Garden Home its name is still standing in gardens all over the district, and much of it is now at the end of its life. A Garden Home tree crew works two to four days per property with a chipper on the street, and the cabin goes at the curb end of the driveway well clear of the drop zone.
Those Garden Home bookings are short and often arranged quickly. We fit them into the existing route so a Garden Home contractor with a crane already booked is not left waiting for a cabin to arrive.
Garden rebuilds and replanting in Garden Home
Once the old Garden Home trees come out, the ground gets rebuilt. A Garden Home replanting job runs three to five weeks with grading, drainage and new stock, and one cabin on the driveway covers the crew for the whole run.
Stock arrives at a Garden Home site on a schedule nobody controls. A Garden Home planting week brings extra hands for a few days when the nursery delivery lands, which is when a second handwashing station earns its place on the Garden Home order.
Creek planting and Garden Home ground conditions
The creek corridor through Garden Home carries a long program of invasive removal and native planting, mostly worked in the wet months. Those Garden Home crews take a cabin at a sealed street end, because the corridor stays soft for most of the year.
The flat ground across Garden Home drains slowly and the rear gardens hold water from November. We keep Garden Home cabins on driveways or hard surface through those months and use a mat for anything on turf in summer.
