Nursery blocks and field crews along Rock Creek
The container yards and field blocks along Rock Creek run crews of twenty or more through the digging and shipping seasons, and there is nothing permanent out among the rows. Growers at Rock Creek take cabins at the headland where the tractor track meets the yard, one for each block being worked, with handwashing stations beside them.
Timing at Rock Creek swings hard with the season. A Rock Creek nursery might need two cabins in January and eight through the spring shipping rush, so we settle a step-up in advance rather than scrambling when the crews arrive on a Monday.
Greenhouse construction and yard building at Rock Creek
Greenhouse ranges and shade structures go up at Rock Creek most summers, and those are proper construction sites with ground works, concrete and steel erection. A Rock Creek greenhouse build takes a cabin at the contractor compound, which is usually the gravel yard the finished range will be served from.
Wash pads, pump houses and reservoirs come with the same Rock Creek program. Crews on that Rock Creek work handle wet material all day, so a handwashing station is not optional on any of those sites.
Creek bottom ground and Rock Creek winters
The bottomland along Rock Creek is rich, deep and slow to drain, which is precisely why it grows what it does. From November a field edge at Rock Creek will not carry a loaded truck, so cabins move to the yard, the gravel headland or the concrete wash pad for the winter.
Flooding along Rock Creek is a real constraint as well. Rock Creek spills into the lower blocks in a wet year, so nothing is left standing on ground the growers themselves expect to see under water.
